Construction Detail: Foundation Footings

Pete Sucheski

Jump Footing

1. Short Span The maximum allowable wall span between footings is 4 feet (for longer spans, consult an engineer).

2. Easy Jump The maximum difference in elevation for residential walls with discontinuous footings is 5 feet.

3. Reinforcing To enable the wall section to function as a beam, install two #4 steel reinforcing rods at the top and bottom (extending 3 feet into the main wall).

Where foundation footings change elevation, forming and pouring a continuous footing is problematic. But the ACI 332 standard referenced in recent codes allows short wall sections to span between discontinuous footings, within certain limits.


About the Author

Ted Cushman

Contributing editor Ted Cushman reports on the construction industry from Hartland, Vt.

Upcoming Events

  • Calgary Dealmakers

    Hudson

    Register Now
  • Vancouver Dealmakers

    Fairmont Pacific Rim

    Register Now
  • Atlanta Dealmakers

    Hyatt Regency Atlanta Perimeter at Villa Christina

    Register Now
All Events