Top 20 Master Planned Communities at 2014’s Halfway Mark

Based on Metrostudy’s quarterly lot-by-lot survey, the Top 20 MPCs started more than 14,800 homes in the past twelve months, roughly the same as the number of starts noted in 2Q13 at 14,900 (still 60% above levels in 2Q12). Here’s the low-down.

Read More

Upcoming Events

  • Build-to-Rent Conference

    JW Marriott Phoenix Desert Ridge

    Register Now
  • Builder 100

    Dana Point, CA

    Register Now
  • Protecto Wall VP Standard Installation Video

    Webinar

    Register for Free
All Events