PRI

Project Details

Project Name
PRI
Location
511 Princeland CtCoronaCAUSA92879
Architect
Domaen
Project Types
Industrial
Project Scope
Shared By
axel
Project Status
Built
Year Completed
2017
Style
Other
Size
9,000 ft²
Team
Principal Designer: Axel Schmitzberger
Principal Builder: Chris Lowe
Designer: Randi Riggs

Project Description

An existing 9000sf industrial warehouse is converted into a high-tech manufacturing facility and office for Adura LED. As part of a series of projects that engage volumetric mass and datum in various forms, the project contemplates the ceiling as a rigid mass, juxtaposed by a pragmatic minimal floorplan. This contrast allows maximum flexibility in programming yet also defines architecturally a volumetric narrative that is non-intrusive to the spatial needs of the client. The ceiling mass changes its vertical datum strategically to create zones of different occupation in some areas, to articulate daylight light wells and to serve as a vertical enclosure to the centralized conference and showroom which itself is visually open to the entire facility. Materially sparse, the rigid mass overhead engages the program playfully, sometimes in broad strokes as in the manufacturing and sometimes in detail such in the form a volumetric entrance desk and presentation wall in the conference room. Visually and graphically the identity is articulated through glazing and linear graphics that serve either as wayfinding or assume textural qualities.

Upcoming Events

  • Happier Homebuyers, Higher Profits: Specifying Fireplaces for Today’s Homes

    Webinar

    Register for Free
  • Sales is a Sport: These Tactics Are the Winning Play

    Webinar

    Register for Free
  • Dispelling Myths and Maximizing Value: Unlock the Potential of Open Web Floor Trusses

    Webinar

    Register for Free
All Events